Chinese translation for "flood losses"
|
- 洪水淹没损失
Related Translations:
- Example Sentences:
| 1. | Potential flood risk analysis and flood losses assessment in northern taihu lake basin 太湖流域北部潜在洪涝风险区分析及影响评估 | | 2. | Combined with the society economy data and the location data of each county , the flood losses were estimated 本论文采用功能强大的mapinfo公司的成熟产品mapx控件,在面向对象的开发环境visualbasi 。 | | 3. | When insurance application or after personal property suffers flood loss , insurance company pays his damage according to insurance contract with fund 当投保单位或个人财产遭受水灾损失后,保险公司就用基金按照保险合同支付其赔偿费。 | | 4. | Geography information system , flood progress modeling , flood loss evaluation , plan of city , town and region , design of information system , web site design and management 地理信息系统、洪水模拟、洪灾损失评估、城镇和区域规划、信息系统设计、网站设计与管理。 | | 5. | Gis can be used in flood risk management system as follows : basic information management , flood risk calculation , flood risk map making , flood risk information query and flood losses evaluation and query Gis在洪灾风险管理系统的开发中的应用主要体现在: l 、基础信息管理; 2 、洪水风险计算; 3 、洪水风险图制作; 4 、洪水风险信息查询; 5 、洪灾经济损失计算与查询。 | | 6. | It is advisable to use non - engineering measures as supplementary approaches for flood control . without doubt , it is still a important way to construct a series of key works and scientifically to forecast and regulate flood water , so that flood loss can be reduced as far as possible 当然,在国家地区社会、经济发展过程中,投入适当的财力进行流域防洪的工程和非工程措施的建设,科学地预报、调度洪水,使洪水形成的灾害减到最低水平,仍然是大江、大河防洪工作的一项长期任务。 | | 7. | Flood risk management is a continuous , circular and dynamic process . it is consist of building target , identifying flood , estimating flood losses , evaluating the risk of flood losses , selecting scenarios to reduce flood risk , making decision to flood risk management , writing plans for flood risk management and evaluating the effect of the decision 洪水灾害风险管理是一个连续的、循环的、动态的过程,主要包括建立风险管理目标、洪水灾害风险识别、洪水灾害风险估计、洪水灾害风险评价、选择洪水灾害风险管理方案、进行洪水灾害风险管理决策、编写洪水灾害风险管理计划、进行洪水灾害风险管理效果评价等几个基本步骤。 | | 8. | This thesis concludes the flood control situation , engineering measures and the situation of optimal dispatch method . it studies flood control engineering system , which is composed of flood prevention reservoir , river course dyke and natural detention basin , and the relationship between various flood engineering measures according to the composition and characteristics of the flood control engineering of the middle - lower reaches of beijiang . it suggests the objective function based on the least flood loss and the optimal dispatch strategy structure of the middle - lower reaches of beijiang bound with the requirements of the flood gradual progress equation combined with hydrology and hydraulics 本论文总结了我国防洪情势、防洪工程措施及其优化调度方法研究的现状;针对珠江流域北江中下游防洪体系的组成及其防洪工程的特性,研究由防洪水库、河道堤防和天然滞洪区共同组成的防洪工程体系中各防洪工程措施之间的关系;提出了以洪灾损失最小为目标函数、以水文学和水力学相结合的洪水演进方程等要求为约束条件的北江中下游防洪体系优化调度策略框架。 |
- Similar Words:
- "flood lights" Chinese translation, "flood line" Chinese translation, "flood lit" Chinese translation, "flood loss management" Chinese translation, "flood loss rate" Chinese translation, "flood lubricated bearing" Chinese translation, "flood lubricatio" Chinese translation, "flood lubrication" Chinese translation, "flood mark" Chinese translation, "flood marks" Chinese translation
|
|
|